| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20093070 | Name of Scheme: SIKANDARPUR NAGLA BINAYK & PATYORA MVS | No. of Villages: 3 | No. of Habitation Covered: 4 |
| Total Population Covered: 4297 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 30-Jun-2027 | Actual Date of Completion (Capex): 19-Jul-2026 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 33.12 M / 142.88 M | SIKANDARPUR NAGLA BINAYK | 27.40419 | 79.37859 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | PUMP | 900 LPM / 60 M | SIKANDARPUR NAGLA BINAYK | 27.40419 | 79.37859 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 275 KL / 18 M | SIKANDARPUR NAGLA BINAYK | 27.40419 | 79.37859 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI PIPE K-7 | 150 | .027 | COMPLETE |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 90 | 2.322 | COMPLETE |
| 2 | HDPE | 63 | 9.085 | COMPLETE |
| 3 | HDPE | 110 | 2.488 | COMPLETE |
| 4 | HDPE | 140 | 3.543 | COMPLETE |
| 5 | HDPE | 160 | 1.273 | COMPLETE |
| 6 | HDPE | 180 | 0.206 | COMPLETE |
| 7 | HDPE | 200 | 0.320 | COMPLETE |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 729 |