| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20093221 | Name of Scheme: RANIAPUR GOBRAHI VISHESWARGANJ (VPL) PWS | No. of Villages: 1 | No. of Habitation Covered: 8 |
| Total Population Covered: 4400 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 01-Oct-2024 | Actual Date of Completion (Capex): 18-Jan-2026 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL-1 | 30.05/116.51 | RANIAPUR GOBRAHI | 27.331538 | 81.272848 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT PUMP-1 | 57/45 | RANIAPUR GOBRAHI | 27.331538 | 81.272848 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | RCC | 300/16 | RANIAPUR GOBRAHI | 27.331538 | 81.272848 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI/K9 | 125 | 0.03 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE PN-6 | 63 | 12.347 | |
| 2 | HDPE PIPE PN-6 | 75 | 1.023 | |
| 3 | HDPE PIPE PN-6 | 90 | 2.165 | |
| 4 | HDPE PIPE PN-6 | 110 | 1.166 | |
| 5 | HDPE PIPE PN-6 | 160 | 0.835 | |
| 6 | HDPE PIPE PN-6 | 200 | 1.126 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 421 |