Project Completion Certificate (Ground Water)
Scheme ID: 20093313 Name of Scheme: HANSULIYA MIHIPURWA (VPL) MVS PWS No. of Villages: 2 No. of Habitation Covered: 8
Total Population Covered: 4174 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 01-Oct-2024 Actual Date of Completion (Capex): 01-Feb-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24/249.8 HANSULIYA 28.07021 81.356734
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT PUMP-1 53/45 HANSULIYA 28.07021 81.356734
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC 275/16 HANSULIYA 28.07021 81.356734
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K7 150 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PN-6 63 7.256
2 HDPE PN-6 75 0.594
3 HDPE PN-6 90 0.359
4 HDPE PN-6 110 1.912
5 HDPE PN-6 125 1.074
6 HDPE PN-6 160 1.612
7 HDPE PN-6 180 0.236
8 HDPE PN-6 200 0.180
HSC Connection
Sno. Total Nos.
1 600
Other Details
2.84
2.84
0.00
15-Jan-2026
01-Feb-2026