| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20093316 | Name of Scheme: DAKAHI KHAS WATER SUPPLY SCHEME | No. of Villages: 3 | No. of Habitation Covered: 7 |
| Total Population Covered: 5010 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 30-Mar-2027 | Actual Date of Completion (Capex): 28-Dec-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell-1 | 27/96.30 | MADANPUR PANIYAR, MURLI | 26.155551 | 82.201251 |
| 2 | Tubewell-2 | 28/58.30 | MADANPUR PANIYAR, MURLI | 26.160036 | 82.20925 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT Pump-1 | 525LPM/49M | MADANPUR PANIYAR, MURLI | 26.155551 | 82.201251 |
| 2 | VT Pump-2 | 525LPM/47M | MADANPUR PANIYAR, MURLI | 26.160036 | 82.20925 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 300KL/18M | MADANPUR PANIYAR, MURLI | 26.155226 | 82.200358 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI Pipe K-7 | 100 | 0.865 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE-PN-6 , PE-100 | 63 | 17.12 | |
| 2 | HDPE-PN-6 , PE-100 | 75 | 8.453 | |
| 3 | HDPE-PN-6 , PE-100 | 90 | 1.514 | |
| 4 | HDPE-PN-6 , PE-100 | 110 | 1.647 | |
| 5 | HDPE-PN-6 , PE-100 | 140 | 0.719 | |
| 6 | HDPE-PN-6 , PE-100 | 160 | 0.271 | |
| 7 | HDPE-PN-6 , PE-100 | 200 | 0.041 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 604 |