Project Completion Certificate (Ground Water)
Scheme ID: 20093336 Name of Scheme: RAJAPUR MAFI CHITAURA (VPL) MVS PWS No. of Villages: 3 No. of Habitation Covered: 7
Total Population Covered: 3250 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 29-Sep-2024 Actual Date of Completion (Capex): 31-Dec-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL-1 24m/204.30m Rajapur Mafi 27.579713 81.562767
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT PUMP-1 700/45 Rajapur Mafi 27.579713 81.562767
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 ZnAl Tank 200/16 Rajapur Mafi 27.579713 81.562767
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K9 100 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 12.960
2 HDPE 75 0.900
3 HDPE 90 0.570
4 HDPE 110 1.190
5 HDPE 160 0.350
6 HDPE 200 0.200
HSC Connection
Sno. Total Nos.
1 650
Other Details
2.82
2.82
2.54
02-May-2026
02-Jun-2026