Project Completion Certificate (Ground Water)
Scheme ID: 20093954 Name of Scheme: Baghail Khand Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 2550 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 28-Oct-2024 Actual Date of Completion (Capex): 18-Feb-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.44/208.85 Baghail Khand 27°38'39"N 82°25'36"E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump -1 540 / 39 Baghail Khand 27°38'39"N 82°25'36"E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 150 KL/12 Mtr Baghail Khand 27°38'39"N 82°25'36"E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI, K-7 100 0.023
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 200 mm dia HDPE Pipe PN 6: Class PE 100 200 0
2 160 mm dia HDPE Pipe PN 6: Class PE 100 160 0.258
3 140 mm dia HDPE Pipe PN 6: Class PE 100 140 0.443
4 110 mm dia HDPE Pipe PN 6: Class PE 100 110 0.568
5 90 mm dia HDPE Pipe PN 6: Class PE 100 90 0.380
6 75 mm dia HDPE Pipe PN 6: Class PE 100 75 1.490
7 63 mm dia HDPE Pipe PN 6: Class PE 100 63 8.750
HSC Connection
Sno. Total Nos.
1 344
Other Details
2.03
0.00
2.24
18-May-2025
18-May-2025