| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20094192 | Name of Scheme: Razderwa Tharoo Water Supply Scheme | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 2200 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 25-Mar-2025 | Actual Date of Completion (Capex): 06-Dec-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 31.04/110.95 | Razderwa Tharoo | 27.62762 | 82.61228 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT Pump -1 | 450 LPM Discharge/ 43 mtr Head | Razderwa Tharoo | 27.62762 | 82.61228 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 125 KL/16 Mtr | Razderwa Tharoo | 27.62762 | 82.61228 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI, K-7 | 100 | 0.009 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 160 | 0.024 | |
| 2 | HDPE | 140 | 0.278 | |
| 3 | HDPE | 90 | 2.519 | |
| 4 | HDPE | 110 | 0.408 | |
| 5 | HDPE | 75 | 0.549 | |
| 6 | HDPE | 63 | 3.536 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 276 |