Project Completion Certificate (Ground Water)
Scheme ID: 20094202 Name of Scheme: Seedhamau No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2061 Base Year: 2023 Intermediate Year: 2038 Design Year: 2023
Date of Completion (As per Contract): 31-Dec-2023 Actual Date of Completion (Capex): 30-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 6/66.40 SEEDHAMAU 26.4151 79.9896
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 71/200 SEEDHAMAU 26.4151 79.9896
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 75/14 SEEDHAMAU 26.4151 79.9896
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.020 COMPLETE
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.85 COMPLETE
2 HDPE 90 0.96 COMPLETE
3 HDPE 110 0.496 COMPLEET
4 HDPE 140 0.160 COMPLETE
HSC Connection
Sno. Total Nos.
1 520
Other Details
1.48
0.00
1.53
09-Aug-2025
10-Aug-2025