| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20095034 | Name of Scheme: AZAMPUR GAJI WSS | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 2127 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 06-Jul-2023 | Actual Date of Completion (Capex): 19-Feb-2026 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube well | 14.50/153.47 | Azampur Gaji | 29.600746 | 78.424222 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump | 450/58 | Azampur Gaji | 29.600746 | 78.424222 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 125/12 | Azampur Gaji | 29.600746 | 78.424222 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI- K7 | 100 | 0.028 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 63 | 4.109 | |
| 2 | HDPE PIPE | 75 | 0.138 | |
| 3 | HDPE PIPE | 90 | 0.238 | |
| 4 | HDPE PIPE | 110 | 0.162 | |
| 5 | HDPE PIPE | 140 | 0.219 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 362 |