Project Completion Certificate (Ground Water)
Scheme ID: 20095133 Name of Scheme: Umarsana PWS No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 1588 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 01-Jun-2022 Actual Date of Completion (Capex): 04-May-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18 m/112 m Umarsana 26.5260516 79.5657816
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Sumersible 350LPM/53M Umarsana 26.5260516 79.5657816
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 100KL/16M Umarsana 26.5260516 79.5657816
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.0144
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2.952
2 HDPE 90 1.343
3 HDPE 110 1.050
4 HDPE 125 0.220
5 HDPE 140 0.475
HSC Connection
Sno. Total Nos.
1 413
Other Details
1.63
0.00
1.66
03-May-2025
05-May-2025