| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20095133 | Name of Scheme: Umarsana PWS | No. of Villages: 1 | No. of Habitation Covered: 2 |
| Total Population Covered: 1588 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 01-Jun-2022 | Actual Date of Completion (Capex): 04-May-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 18 m/112 m | Umarsana | 26.5260516 | 79.5657816 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Sumersible | 350LPM/53M | Umarsana | 26.5260516 | 79.5657816 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 100KL/16M | Umarsana | 26.5260516 | 79.5657816 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 0.0144 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 2.952 | |
| 2 | HDPE | 90 | 1.343 | |
| 3 | HDPE | 110 | 1.050 | |
| 4 | HDPE | 125 | 0.220 | |
| 5 | HDPE | 140 | 0.475 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 413 |