| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20095136 | Name of Scheme: Lidhaura PWS | No. of Villages: 1 | No. of Habitation Covered: 5 |
| Total Population Covered: 2431 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 01-Jun-2022 | Actual Date of Completion (Capex): 10-Apr-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 24.09 M/ 102.31 M | LIDHAURA | 26.696788 | 79.348571 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 550 LPM /53 M | LIDHAURA | 26.696788 | 79.348571 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 150 KL / 16 M | LIDHAURA | 26.696788 | 79.348571 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 150 | 10 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 2.6185 | |
| 2 | HDPE | 90 | 2.9837 | |
| 3 | HDPE | 110 | 1.149 | |
| 4 | HDPE | 125 | 0.765 | |
| 5 | HDPE | 140 | 1.315 | |
| 6 | HDPE | 160 | 0.856 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 469 |