Scheme ID: 20095806 Name of Scheme: SILIMI GARAHWA No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 4860 Base Year: 2023 Intermediate Year: 2038 Design Year: 2058
Date of Completion (As per Contract): 15-May-2023 Actual Date of Completion (Capex): 30-Jun-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 18M/81 m SILMI GARHWA 25'.566501 N 81.205848"E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 submersible 950 LPM / 55 M SILMI GARHWA 25".566501 N 81.205848"8
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 25OKL/16M SILMI GARHWA 25'.566501 N 81.205848'E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. K-9 150 0.01050
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 200 0.369
2 HDPE 180 0.1916
3 HDPE 160 0.1999
4 HDPE 140 0.260
5 HDPE 125 0.1308
6 HDPE 110 2.0675
7 HDPE 90 1.0993
8 HDPE 75 2.8086
9 HDPE 63 8.2053
HSC Connection
Sno. Total Nos.
1 915
Other Details
3.81
0.00
3.81
12-Apr-2025
12-Jul-2025