| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20095806 | Name of Scheme: SILIMI GARAHWA | No. of Villages: 1 | No. of Habitation Covered: 3 |
| Total Population Covered: 4860 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2058 |
| Date of Completion (As per Contract): 15-May-2023 | Actual Date of Completion (Capex): 30-Jun-2026 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube well | 18M/81 m | SILMI GARHWA | 25'.566501 N | 81.205848"E |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | submersible | 950 LPM / 55 M | SILMI GARHWA | 25".566501 N | 81.205848"8 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 25OKL/16M | SILMI GARHWA | 25'.566501 N | 81.205848'E |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. K-9 | 150 | 0.01050 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 200 | 0.369 | |
| 2 | HDPE | 180 | 0.1916 | |
| 3 | HDPE | 160 | 0.1999 | |
| 4 | HDPE | 140 | 0.260 | |
| 5 | HDPE | 125 | 0.1308 | |
| 6 | HDPE | 110 | 2.0675 | |
| 7 | HDPE | 90 | 1.0993 | |
| 8 | HDPE | 75 | 2.8086 | |
| 9 | HDPE | 63 | 8.2053 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 915 |