Project Completion Certificate (Ground Water)
Scheme ID: 20096252 Name of Scheme: ANDHIYARWA Water Supply Scheme No. of Villages: 2 No. of Habitation Covered: 4
Total Population Covered: 4080 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 23-Nov-2023 Actual Date of Completion (Capex): 20-Mar-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering of aboveTubewwll assembly 40.04/100 Andiyarwa 26.374222 82.530793
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 AC submercible pumping plant 15hp 850/46 Andiyarwa 26.374 82.53
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC Tank 250/16 Andiyarwa 26.374 82.530
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe-K7 150 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 90 0.707
2 HDPE Pipe PN-6: Class PE-100 75 0.683
3 HDPE Pipe PN-6: Class PE-100 63 17.030
4 HDPE Pipe PN-6: Class PE-100 110 0.571
5 HDPE Pipe PN-6: Class PE-100 140 1.276
6 HDPE Pipe PN-6: Class PE-100 160 1.684
7 HDPE Pipe PN-6: Class PE-100 200 0.548
HSC Connection
Sno. Total Nos.
1 554
Other Details
3.12
2.98
2.98
20-Mar-2026
21-Mar-2026