Project Completion Certificate (Ground Water)
Scheme ID: 20096719 Name of Scheme: MAUCHENA JJM No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1230 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 14-May-2024 Actual Date of Completion (Capex): 01-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18 M/ 88.8 M MAUCHENA 27.042812 80.608897
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.260 M³ per Min /41 Mtr MAUCHENA 27.042812 80.608897
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 50 KL/ 12 Mtr MAUCHENA 27.042808 80.608924
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 100 0.018
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 1.876
2 HDPE Pipe PN-6: Class PE-100 75 0.526
3 HDPE Pipe PN-6: Class PE-100 90 0.272
4 HDPE Pipe PN-6: Class PE-100 110 0.219
5 HDPE Pipe PN-6: Class PE-100 125 0.225
6 HDPE Pipe PN-6: Class PE-100 140 0.107
HSC Connection
Sno. Total Nos.
1 223
Other Details
1.23
0.00
1.23
31-Aug-2024
26-Sep-2025