Project Completion Certificate (Ground Water)
Scheme ID: 20096720 Name of Scheme: TARAF MANDIE JJM No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1410 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 14-May-2024 Actual Date of Completion (Capex): 08-Jan-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 12 M/ 78 M TARAF MANDIE 27.083759 80.536032
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 0.290 M³ per Min /41 Mtr TARAF MANDIE 27.083759 80.536032
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 75 KL/ 12 Mtr TARAF MANDIE 27.085411 80.532166
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe 100 0.017
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 1.436
2 HDPE Pipe PN-6: Class PE-100 75 2.030
3 HDPE Pipe PN-6: Class PE-100 90 0.657
4 HDPE Pipe PN-6: Class PE-100 110 0.048
5 HDPE Pipe PN-6: Class PE-100 125 0.476
HSC Connection
Sno. Total Nos.
1 269
Other Details
1.33
0.00
1.33
07-Apr-2024
26-Sep-2025