| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20096720 | Name of Scheme: TARAF MANDIE JJM | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 1410 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 14-May-2024 | Actual Date of Completion (Capex): 08-Jan-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 12 M/ 78 M | TARAF MANDIE | 27.083759 | 80.536032 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 0.290 M³ per Min /41 Mtr | TARAF MANDIE | 27.083759 | 80.536032 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 75 KL/ 12 Mtr | TARAF MANDIE | 27.085411 | 80.532166 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. Pipe | 100 | 0.017 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6: Class PE-100 | 63 | 1.436 | |
| 2 | HDPE Pipe PN-6: Class PE-100 | 75 | 2.030 | |
| 3 | HDPE Pipe PN-6: Class PE-100 | 90 | 0.657 | |
| 4 | HDPE Pipe PN-6: Class PE-100 | 110 | 0.048 | |
| 5 | HDPE Pipe PN-6: Class PE-100 | 125 | 0.476 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 269 |