Project Completion Certificate (Ground Water)
Scheme ID: 20096864 Name of Scheme: Singhpur Shioli No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2080 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 04-Mar-2023 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 21/171 Singhpur Shioli 26.655814 79.966857
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 32.5/59 Singhpur Shioli 26.655814 79.966857
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 125/14 Singhpur Shioli 26.655814 79.966857
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.0215 As per Site
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.6 As Per site
2 HDPE 75 0.051 As Per site
3 HDPE 90 3.113 As Per site
4 HDPE 125 0.178 As Per site
5 HDPE 140 0.044 As Per site
HSC Connection
Sno. Total Nos.
1 360
Other Details
1.83
1.85
1.85
12-Sep-2023
13-Sep-2023