Project Completion Certificate (Ground Water)
Scheme ID: 20097009 Name of Scheme: KUWASI GRAM PANCHAYAT WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 5
Total Population Covered: 2200 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 18-Jul-2024 Actual Date of Completion (Capex): 06-Dec-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 21.00 M / 177.30 M Kuwasi 26.501922 81.78745
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 300 LPM / 50 M Kuwasi 26.501922 81.78745
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 100 KL / 14 M Kuwasi 26.501922 81.78745
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI / K7 100 0.017
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE / PN-6:Class PE-100 63 5.629
2 HDPE / PN-6:Class PE-100 75 1.024
3 HDPE / PN-6:Class PE-100 90 0.651
4 HDPE / PN-6:Class PE-100 110 0.595
5 HDPE / PN-6:Class PE-100 125 0.177
HSC Connection
Sno. Total Nos.
1 308
Other Details
2.13
0.00
2.17
08-Mar-2026
15-Mar-2026