Project Completion Certificate (Ground Water)
Scheme ID: 20097515 Name of Scheme: HASWA No. of Villages: 1 No. of Habitation Covered: 6
Total Population Covered: 12130 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 20-Sep-2024 Actual Date of Completion (Capex): 25-Mar-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 "Deep Tube well - 1020 LPM" 31 m / 131.63 m Haswa 25.869269 80.913085
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 25.0 HP Submersible Pump 1020 LPM / 60 Mtr. Haswa 25.869269 80.913085
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Elevated Storage Reservoir 350 KL / 20 Mtr. Haswa 25.869378 25.869378
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. K-9 150 0.016
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN.6 200 1.0608
2 HDPE PIPE PN.6 180 0.7929
3 HDPE PIPE PN.6 160 0.313
4 HDPE PIPE PN.6 140 2.5678
5 HDPE PIPE PN.6 125 0.6035
6 HDPE PIPE PN.6 110 2.2881
7 HDPE PIPE PN.6 90 8.54412
8 HDPE PIPE PN.6 75 3.2782
9 HDPE PIPE PN.6 63 6.0412
HSC Connection
Sno. Total Nos.
1 2184
Other Details
5.29
0.00
5.41
01-Aug-2025
02-Aug-2025