| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20097515 | Name of Scheme: HASWA | No. of Villages: 1 | No. of Habitation Covered: 6 |
| Total Population Covered: 12130 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 20-Sep-2024 | Actual Date of Completion (Capex): 25-Mar-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | "Deep Tube well - 1020 LPM" | 31 m / 131.63 m | Haswa | 25.869269 | 80.913085 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 25.0 HP Submersible Pump | 1020 LPM / 60 Mtr. | Haswa | 25.869269 | 80.913085 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Elevated Storage Reservoir | 350 KL / 20 Mtr. | Haswa | 25.869378 | 25.869378 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. K-9 | 150 | 0.016 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE PN.6 | 200 | 1.0608 | |
| 2 | HDPE PIPE PN.6 | 180 | 0.7929 | |
| 3 | HDPE PIPE PN.6 | 160 | 0.313 | |
| 4 | HDPE PIPE PN.6 | 140 | 2.5678 | |
| 5 | HDPE PIPE PN.6 | 125 | 0.6035 | |
| 6 | HDPE PIPE PN.6 | 110 | 2.2881 | |
| 7 | HDPE PIPE PN.6 | 90 | 8.54412 | |
| 8 | HDPE PIPE PN.6 | 75 | 3.2782 | |
| 9 | HDPE PIPE PN.6 | 63 | 6.0412 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 2184 |