| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20097749 | Name of Scheme: MAVAIYA , GADHI | No. of Villages: 2 | No. of Habitation Covered: 19 |
| Total Population Covered: 4020 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 25-Sep-2024 | Actual Date of Completion (Capex): 25-Jun-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Deep Tube well / 830 LPM | 28 M / 85.50 M | Gadhi | 25.712877 | 80.662429 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 20.0 HP Submersible Pump | 830 LPM / 60 M | Gadhi | 25.712877 | 80.662429 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Elevated Storage Reservoir | 250 KL / 20 M | Gadhi | 25.713042 | 80.662187 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. K-9 | 150 | 0.012 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 200 | 0.1223 | |
| 2 | HDPE | 180 | 0.9594 | |
| 3 | HDPE | 160 | 0.7064 | |
| 4 | HDPE | 140 | 1.6992 | |
| 5 | HDPE | 125 | 1.1413 | |
| 6 | HDPE | 110 | 1.1593 | |
| 7 | HDPE | 90 | 2.9572 | |
| 8 | HDPE | 75 | 2.7829 | |
| 9 | HDPE | 63 | 3.1665 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 454 |