Project Completion Certificate (Ground Water)
Scheme ID: 20097762 Name of Scheme: ACHINTPUR PITAI No. of Villages: 2 No. of Habitation Covered: 7
Total Population Covered: 4460 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 24-Jan-2025 Actual Date of Completion (Capex): 01-Sep-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 "Deep Tube well 1 - 450 LPM" 12 m / 37.50 m Achintpur Pitai 25.919403 81.017787
2 "Deep Tube well 2 - 480 LPM" 12 m / 38.50 m Achintpur Pitai 25.919346 81.019285
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 12.50 HP Submersible Pump 450 LPM / 60 Mtr. Achintpur Pitai 25.919403 81.017787
2 12.50 HP Submersible Pump 480 LPM / 60 Mtr. Achintpur Pitai 25.919346 81.019285
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Elevated Storage Reservoir 275 KL / 16 M Achintpur Pitai 25.919402 81.017698
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-9 100 0.07260
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6 200 0.2646
2 HDPE Pipe PN-6 180 0.477
3 HDPE Pipe PN-6 160 0.336
4 HDPE Pipe PN-6 140 1.0308
5 HDPE Pipe PN-6 110 2.1437
6 HDPE Pipe PN-6 90 2.4146
7 HDPE Pipe PN-6 75 2.6215
8 HDPE Pipe PN-6 63 4.8147
HSC Connection
Sno. Total Nos.
1 910
Other Details
4.09
0.00
4.09
08-Jan-2026
09-Jan-2026