| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20097762 | Name of Scheme: ACHINTPUR PITAI | No. of Villages: 2 | No. of Habitation Covered: 7 |
| Total Population Covered: 4460 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 24-Jan-2025 | Actual Date of Completion (Capex): 01-Sep-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | "Deep Tube well 1 - 450 LPM" | 12 m / 37.50 m | Achintpur Pitai | 25.919403 | 81.017787 |
| 2 | "Deep Tube well 2 - 480 LPM" | 12 m / 38.50 m | Achintpur Pitai | 25.919346 | 81.019285 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 12.50 HP Submersible Pump | 450 LPM / 60 Mtr. | Achintpur Pitai | 25.919403 | 81.017787 |
| 2 | 12.50 HP Submersible Pump | 480 LPM / 60 Mtr. | Achintpur Pitai | 25.919346 | 81.019285 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Elevated Storage Reservoir | 275 KL / 16 M | Achintpur Pitai | 25.919402 | 81.017698 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-9 | 100 | 0.07260 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6 | 200 | 0.2646 | |
| 2 | HDPE Pipe PN-6 | 180 | 0.477 | |
| 3 | HDPE Pipe PN-6 | 160 | 0.336 | |
| 4 | HDPE Pipe PN-6 | 140 | 1.0308 | |
| 5 | HDPE Pipe PN-6 | 110 | 2.1437 | |
| 6 | HDPE Pipe PN-6 | 90 | 2.4146 | |
| 7 | HDPE Pipe PN-6 | 75 | 2.6215 | |
| 8 | HDPE Pipe PN-6 | 63 | 4.8147 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 910 |