Project Completion Certificate (Ground Water)
Scheme ID: 20098101 Name of Scheme: MAWANA KHURD No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 7474 Base Year: 2023 Intermediate Year: 2037 Design Year: 2053
Date of Completion (As per Contract): 11-Jun-2025 Actual Date of Completion (Capex): 10-Jan-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.12 Mtr / 101.85 Mtr MAWANA KHURD 29.079491 77.861741
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 650 LPM / 58 Mtr MAWANA KHURD 29.079491 77.861741
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 225 Kl / 20 M MAWANA KHURD 29.079491 77.861741
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.01655
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 6.803
2 HDPE 90 3.357
3 HDPE 110 1.517
4 HDPE 125 0.976
5 HDPE 140 0.540
6 HDPE 160 0.508
7 HDPE 180 0.351
8 HDPE 200 1.086
HSC Connection
Sno. Total Nos.
1 1680
Other Details
5.05
5.05
4.09
29-May-2025
01-Mar-2026