Project Completion Certificate (Ground Water)
Scheme ID: 20098142 Name of Scheme: JATAULA-MUZZAFFARPUR KHUNTI No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2448 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 16-Aug-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 30.14 Mtr / 94.04 Mtr JATAULA - MUZZAFFARPUR 28.981599 78.020294
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 550 LPM / 54 Mtr JATAULA - MUZZAFFARPUR 28.981599 78.020294
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150 Kl / 16 M JATAULA - MUZZAFFARPUR 28.981599 78.020294
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.0258
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.230
2 HDPE 90 1.197
3 HDPE 110 0.373
4 HDPE 180 3.190
HSC Connection
Sno. Total Nos.
1 507
Other Details
2.80
2.80
2.30
08-Jan-2025
09-Jan-2025