Project Completion Certificate (Ground Water)
Scheme ID: 20098167 Name of Scheme: MAINPUTHI-DEOLI KHERA URF JAINPUR No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 5764 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Jan-2025 Actual Date of Completion (Capex): 28-Sep-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 41.28 Mtr / 91.23 Mtr MAINAPUTHI-DEOLIKHERAURFJAINPUR 29.123281 77.507231
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 1150 LPM / 56 Mtr MAINAPUTHI-DEOLIKHERAURFJAINPUR 29.123281 77.507231
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 325 Kl / 18 M MAINAPUTHI-DEOLI KHERA URF JAINPUR 29.123281 77.507231
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.0261
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 6.140
2 HDPE 90 3.130
3 HDPE 110 0.840
4 HDPE 125 0.380
5 HDPE 125 0.380
6 HDPE 160 1.691
7 HDPE 180 0.154
HSC Connection
Sno. Total Nos.
1 1027
Other Details
4.64
4.64
3.71
14-Feb-2025
15-Feb-2025