Project Completion Certificate (Ground Water)
Scheme ID: 20098326 Name of Scheme: RAMCHANDRA PUR Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 5
Total Population Covered: 1754 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 24-Apr-2024 Actual Date of Completion (Capex): 20-May-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 15.07/49.04 RAMCHANDRA PUR 26.108277 83.029771
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE - 1 150 LPM/52M RAMCHANDRA PUR 26.108277 83.029771
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT - 1 50 KL/ 14 M RAMCHANDRA PUR 26.108277 83.029771
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 100 0.024
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 8.078
2 HDPE 90 2.065
3 HDPE 110 1.153
4 HDPE 140 0.119
HSC Connection
Sno. Total Nos.
1 314
Other Details
2.01
0.00
2.00
20-Aug-2025
21-Nov-2025