Project Completion Certificate (Ground Water)
Scheme ID: 20098330 Name of Scheme: Mira Mau Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 5
Total Population Covered: 7717 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 24-Apr-2024 Actual Date of Completion (Capex): 25-Jun-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 22.47/71.77 Mira Mau 26.327941 81.555387
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 400 LPM / 50 M Mira Mau 26.327941 81.555387
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 100/12 Mira Mau 26.327941 81.555387
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 100 0.026
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.762
2 HDPE 90 1.775
3 HDPE 110 0.716
4 HDPE 125 0.449
5 HDPE 140 0.718
HSC Connection
Sno. Total Nos.
1 446
Other Details
2.09
0.00
2.07
25-Sep-2024
26-Dec-2024