| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20098330 | Name of Scheme: Mira Mau Water Supply Scheme | No. of Villages: 1 | No. of Habitation Covered: 5 |
| Total Population Covered: 7717 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 24-Apr-2024 | Actual Date of Completion (Capex): 25-Jun-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 22.47/71.77 | Mira Mau | 26.327941 | 81.555387 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE | 400 LPM / 50 M | Mira Mau | 26.327941 | 81.555387 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 100/12 | Mira Mau | 26.327941 | 81.555387 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-7 | 100 | 0.026 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 4.762 | |
| 2 | HDPE | 90 | 1.775 | |
| 3 | HDPE | 110 | 0.716 | |
| 4 | HDPE | 125 | 0.449 | |
| 5 | HDPE | 140 | 0.718 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 446 |