Project Completion Certificate (Ground Water)
Scheme ID: 20098951 Name of Scheme: FEROZEPUR VILLAGE WATER SUPPLY SCHEME No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 1822 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 04-Oct-2024 Actual Date of Completion (Capex): 03-Dec-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Slotted Pipe 150mm 23.98 TW 26.0406204 83.5943687
2 Plain Pipe 150mm 90.3 TW 26.0406204 83.5943687
3 Housing Pipe 200mm 42.02 TW 26.0406204 83.5943687
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Solar Submersible Pump 400/49 TW 26.0406204 83.5943687
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Zinc Tank 100/16 OHT 26.0406204 83.5943687
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 200 0.03
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 5.11
2 HDPE Pipe PN-6: Class PE-100 75 1.04
3 HDPE Pipe PN-6: Class PE-100 90 0.61
4 HDPE Pipe PN-6: Class PE-100 110 0.84
5 HDPE Pipe PN-6: Class PE-100 140 0.38
6 HDPE Pipe PN-6: Class PE-100 160 0.21
7 HDPE Pipe PN-6: Class PE-100 180 0.61
8 HDPE Pipe PN-6: Class PE-100 200 0.39
HSC Connection
Sno. Total Nos.
1 337
Other Details
2.16
1.77
1.83
01-Dec-2025
03-Dec-2025