| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20098989 | Name of Scheme: SIDARKHA KAISARGANJ (VPL) PWS | No. of Villages: 1 | No. of Habitation Covered: 4 |
| Total Population Covered: 1800 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 03-Oct-2024 | Actual Date of Completion (Capex): 15-Feb-2026 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL-1 | 27/266.3 | SIDHARKHA | 27.327139 | 81.559471 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT PUMP-1 | 24/45 | SIDHARKHA | 27.327139 | 81.559471 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | ZINC ALUM | 125/12 | SIDHARKHA | 27.327139 | 81.559471 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI/K9 | 100 | 0.03 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PN-6 | 63 | 3.63 | |
| 2 | HDPE PN-6 | 75 | 0.884 | |
| 3 | HDPE PN-6 | 160 | 0.254 | |
| 4 | HDPE PN-6 | 90 | 0.631 | |
| 5 | HDPE PN-6 | 110 | 0.104 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 141 |