Project Completion Certificate (Ground Water)
Scheme ID: 20099295 Name of Scheme: Babayan PWS No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 1601 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 18-Feb-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18.08 m/ 95.29 m Babayan 26.478937 79.276223
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 350 lpm / 61 m Babayan 26.478937 79.276223
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 100 kl / 14 m Babayan 26.478937 79.276223
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.006
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 1.001
2 HDPE 90 1.015
3 HDPE 140 0.796
HSC Connection
Sno. Total Nos.
1 393
Other Details
1.54
0.00
0.00
17-Feb-2025
19-Feb-2025