Project Completion Certificate (Ground Water)
Scheme ID: 20099296 Name of Scheme: Usarari PWS No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 4568 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 01-Jul-2021 Actual Date of Completion (Capex): 14-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewells 30 USARARI 26.631835 79.628834
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 1000 LPM/ 60M USARARI 26.631835 79.628834
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 275 KL/ 18M USARARI 26.631835 79.628834
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 8.50
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5928
2 HDPE 90 2975
3 HDPE 110 361
4 HDPE 125 748
5 HDPE 140 338
6 HDPE 180 672
HSC Connection
Sno. Total Nos.
1 782
Other Details
3.07
0.00
0.00
15-Mar-2024
13-Jun-2024