Project Completion Certificate (Ground Water)
Scheme ID: 20099444 Name of Scheme: Umedpur (QA) No. of Villages: 3 No. of Habitation Covered: 4
Total Population Covered: 2278 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 18-Jul-2023 Actual Date of Completion (Capex): 17-Jul-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewll 22/126.01 umedpur 25.942438 80.712729
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible pump 12.5hp/50mtr Umedpur 25.942438 80.712729
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150/12 Umedpur 25.942438 80.712729
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-9 100 30
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5315.9
2 HDPE 75 1512.9
3 HDPE 90 734.3
4 HDPE 110 970.5
5 HDPE 125 670
6 HDPE 125 670
7 HDPE 160 405
8 HDPE 180 744
HSC Connection
Sno. Total Nos.
1 560
Other Details
2.65
0.00
2.59
15-Jan-2026
16-Jan-2026