| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20099647 | Name of Scheme: Girdaun | No. of Villages: 2 | No. of Habitation Covered: 3 |
| Total Population Covered: 3446 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2023 |
| Date of Completion (As per Contract): 17-Jan-2023 | Actual Date of Completion (Capex): 16-Jan-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL | 16/134.52 | GIRDAUN | 26.269928 | 79.911652 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 0.025 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 63 | 7.497 | |
| 2 | HDPE PIPE | 75 | 0.235 | |
| 3 | HDPE PIPE | 90 | 0.965 | |
| 4 | HDPE PIPE | 110 | 2.973 | |
| 5 | HDPE PIPE | 125 | 0.996 | |
| 6 | HDPE PIPE | 140 | 0.072 | |
| 7 | HDPE PIPE | 160 | 0.095 | |
| 8 | HDPE PIPE | 180 | 0.047 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 687 |