Project Completion Certificate (Ground Water)
Scheme ID: 20099693 Name of Scheme: Daorahat Bangar No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1564 Base Year: 2023 Intermediate Year: 2038 Design Year: 2023
Date of Completion (As per Contract): 30-Nov-2023 Actual Date of Completion (Capex): 31-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 72/66.30 DAORAHAT BANGAR 26.122157° 79.883915°
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersibale 150/73 DAORAHAT BANGAR 26.122157° 79.883915°
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 50/16 DAORAHAT BANGAR 26.122157° 79.883915°
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.020 Complete
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.796
2 HDPE 90 1.653
3 HDPE 110 1.435
4 HDPE 140 0.055
HSC Connection
Sno. Total Nos.
1 380
Other Details
1.92
0.00
1.65
20-Mar-2024
21-Mar-2024