| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20099781 | Name of Scheme: PARSA JARWAL (VPL) PWS | No. of Villages: 1 | No. of Habitation Covered: 3 |
| Total Population Covered: 3304 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 04-Feb-2025 | Actual Date of Completion (Capex): 31-Dec-2026 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL-1 | 30.07M/205.70M | PARSA | 27.154259 | 81.51141 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT-PUMP | 42(M³)/45MTR | PARSA | 27.154259 | 81.51141 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | znAl Tank | 200kl/16mtr | PARSA | 27.154259 | 81.51141 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-7 | 100 | 0.03 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 3.556 | |
| 2 | HDPE | 75 | 0.435 | |
| 3 | HDPE | 90 | 0.482 | |
| 4 | HDPE | 110 | 0.439 | |
| 5 | HDPE | 160 | 0.644 | |
| 6 | HDPE | 200 | 0.578 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 276 |