| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20099785 | Name of Scheme: LALBOJHE MIHIPURWA (VPL) PWS | No. of Villages: 1 | No. of Habitation Covered: 5 |
| Total Population Covered: 2452 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 08-Dec-2024 | Actual Date of Completion (Capex): 31-Dec-2026 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL-1 | 30.07/202.26 | LALBOJHE | 28.126205 | 81.242995 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT-PUMP | 31.8/45 | LALBOJHE | 28.126205 | 81.242995 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OVERHAED TANK | 175/12 | LALBOJHE | 28.126205 | 81.242995 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-7 | 125 | 0.035 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 6.363 | |
| 2 | HDPE | 75 | 0.373 | |
| 3 | HDPE | 90 | 0.388 | |
| 4 | HDPE | 110 | 0.659 | |
| 5 | HDPE | 125 | 0.206 | |
| 6 | HDPE | 140 | 0.389 | |
| 7 | HDPE | 160 | 0.027 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 492 |