Project Completion Certificate (Ground Water)
Scheme ID: 20099806 Name of Scheme: Barhi Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 5
Total Population Covered: 2010 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 23-Nov-2024 Actual Date of Completion (Capex): 01-Jul-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 15/114.85 Barhi 26.6576 83.5691
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 24/41 Barhi 26.6576 83.5691
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Overhead Tank-1 125/14 Barhi 26.6576 83.5691
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.015 Laying Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 7.87 Laying Completed
2 HDPE 75 0.13 Laying Completed
3 HDPE 110 0.77 Laying Completed
HSC Connection
Sno. Total Nos.
1 392
Other Details
1.59
0.00
2.05
31-May-2026
01-Jul-2026