Project Completion Certificate (Ground Water)
Scheme ID: 20099819 Name of Scheme: SIRSA MOHAN SVS (O) No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 461 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2027 Actual Date of Completion (Capex): 05-Apr-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Solar Powered Pump 6.03/92.72 Sirsa Mohan 28.849216666666667 78.62997166666668
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Solar Powered Pump 100/26 Sirsa Mohan 28.849216666666667 78.62997166666668
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 PN-6 PE100/HDPE 63 1.687
2 PN-6 PE100/HDPE 90 1.0956
HSC Connection
Sno. Total Nos.
1 115
Other Details
0.97
0.00
0.00
18-Jul-2026
19-Jul-2026