Project Completion Certificate (Ground Water)
Scheme ID: 20099820 Name of Scheme: Sathari Water Supply Scheme No. of Villages: 2 No. of Habitation Covered: 4
Total Population Covered: 3550 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 23-Nov-2024 Actual Date of Completion (Capex): 01-Jul-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24/108.83 Sathari 26.666 83.5787
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 42/39 Sathari 26.666 83.5787
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Overhead Tank-1 200/12 Sathari 26.666 83.5787
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.015 Laying Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 11.20 Laying Completed
2 HDPE 75 0.36 Laying Completed
3 HDPE 90 0.15 Laying Completed
4 HDPE 110 0.08 Laying Completed
5 HDPE 140 0.28 Laying Completed
HSC Connection
Sno. Total Nos.
1 519
Other Details
1.96
0.00
2.05
02-Sep-2024
01-Jul-2026