Project Completion Certificate (Ground Water)
Scheme ID: 20099839 Name of Scheme: Ahmadpur W/S Scheme No. of Villages: 2 No. of Habitation Covered: 9
Total Population Covered: 2195 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 26-Jan-2025 Actual Date of Completion (Capex): 30-Nov-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 MSERW PLAIN PIPE-200 MM 36.68 Ahmadpur 27.145058 83.49719
2 MSERW PLAIN PIPE-150 MM 113.7 Ahmadpur 27.145058 83.49719
3 MSERW SLOTTED PIPE-150 MM 15 Ahmadpur 27.145058 83.49719
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 26.99/44M Ahmadpur 27.145058 83.49719
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 ZINC ALM OHT 150KL/16M Ahmadpur 27.149836 83.494632
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DOUBLE FLANGE DI-K9 100 0.0225
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 PN-6/PE-100/HDPE 63 7779
2 PN-6/PE-100/HDPE 75 149
3 PN-6/PE-100/HDPE 110 497
4 PN-6/PE-100/HDPE 140 2074
HSC Connection
Sno. Total Nos.
1 359
Other Details
1.86
0.00
1.86
01-Mar-2026
01-Mar-2025