| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20099839 | Name of Scheme: Ahmadpur W/S Scheme | No. of Villages: 2 | No. of Habitation Covered: 9 |
| Total Population Covered: 2195 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 26-Jan-2025 | Actual Date of Completion (Capex): 30-Nov-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | MSERW PLAIN PIPE-200 MM | 36.68 | Ahmadpur | 27.145058 | 83.49719 |
| 2 | MSERW PLAIN PIPE-150 MM | 113.7 | Ahmadpur | 27.145058 | 83.49719 |
| 3 | MSERW SLOTTED PIPE-150 MM | 15 | Ahmadpur | 27.145058 | 83.49719 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP | 26.99/44M | Ahmadpur | 27.145058 | 83.49719 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | ZINC ALM OHT | 150KL/16M | Ahmadpur | 27.149836 | 83.494632 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DOUBLE FLANGE DI-K9 | 100 | 0.0225 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | PN-6/PE-100/HDPE | 63 | 7779 | |
| 2 | PN-6/PE-100/HDPE | 75 | 149 | |
| 3 | PN-6/PE-100/HDPE | 110 | 497 | |
| 4 | PN-6/PE-100/HDPE | 140 | 2074 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 359 |