Project Completion Certificate (Ground Water)
Scheme ID: 20100181 Name of Scheme: Mohamad Alipur Chohar WSS No. of Villages: 6 No. of Habitation Covered: 6
Total Population Covered: 1819 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 06-Jul-2023 Actual Date of Completion (Capex): 19-Jan-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 23.05/141.1 Md. Alipur Chauhar 29.41569 78.662473
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 360/52 Md. Alipur Chauhar 29.41569 78.662473
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 100/16 Md. Alipur Chauhar 29.41569 78.662473
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI- K7 100 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 63 9.080
2 HDPE PIPE 75 1.980
3 HDPE PIPE 90 1.868
4 HDPE PIPE 110 0.251
5 HDPE PIPE 140 0.074
HSC Connection
Sno. Total Nos.
1 340
Other Details
2.05
0.00
2.08
19-Jul-2026
20-Jul-2026