| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20100200 | Name of Scheme: Kutubpur WSs | No. of Villages: 3 | No. of Habitation Covered: 3 |
| Total Population Covered: 1589 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 06-Jul-2023 | Actual Date of Completion (Capex): 10-Nov-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube Well | 24.04 / 140.39 | Kutubpur | 29.593423 | 78.24217 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 310 / 55 | Kutubpur | 29.593423 | 78.24217 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 100 / 12 | Kutubpur | 29.593423 | 78.24217 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI - K7 | 100 | 0.016 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 5.937 | |
| 2 | HDPE | 75 | 0.163 | |
| 3 | HDPE | 90 | 0.050 | |
| 4 | HDPE | 110 | 0.750 | |
| 5 | HDPE | 125 | 0.079 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 440 |