Project Completion Certificate (Ground Water)
Scheme ID: 20100200 Name of Scheme: Kutubpur WSs No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 1589 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 06-Jul-2023 Actual Date of Completion (Capex): 10-Nov-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube Well 24.04 / 140.39 Kutubpur 29.593423 78.24217
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 310 / 55 Kutubpur 29.593423 78.24217
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 100 / 12 Kutubpur 29.593423 78.24217
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI - K7 100 0.016
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.937
2 HDPE 75 0.163
3 HDPE 90 0.050
4 HDPE 110 0.750
5 HDPE 125 0.079
HSC Connection
Sno. Total Nos.
1 440
Other Details
1.74
0.00
1.77
10-May-2026
11-May-2026