Project Completion Certificate (Ground Water)
Scheme ID: 20100805 Name of Scheme: PATTISHAH No. of Villages: 1 No. of Habitation Covered: 11
Total Population Covered: 5880 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 18-Mar-2024 Actual Date of Completion (Capex): 30-Jun-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 15/123.0 PATTI SHAH 25'.935757'N 81.179292"8
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 submersible 500/60 PATTI SHAH 25'.935757'N 81.179292"8
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT.1 175/14 PATTI SHAH 25'.935757'N 81.179292"8
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.t. K-9 80 0.03050
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 200 0.4725
2 HDPE 140 1.7136
3 HDPE 125 0.4787
4 HDPE 110 1.6924
5 HDPE 90 2.230
6 HDPE 75 1.4985
7 HDPE 63 9.7337
HSC Connection
Sno. Total Nos.
1 1190
Other Details
3.56
0.00
3.63
11-Nov-2024
12-Nov-2024