Project Completion Certificate (Ground Water)
Scheme ID: 20100871 Name of Scheme: Mewala Mafi WSS No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 799 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Mar-2026 Actual Date of Completion (Capex): 01-Aug-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN -6: CLASS PE -100 63 1.57
2 HDPE PIPE PN -6: CLASS PE -100 90 0.21
HSC Connection
Sno. Total Nos.
Other Details
1.03
1.03
1.02
31-Oct-2025
01-Nov-2025