Project Completion Certificate (Ground Water)
Scheme ID: 20101221 Name of Scheme: Noorpur Arab WSS No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 3336 Base Year: 2023 Intermediate Year: 2038 Design Year: 2038
Date of Completion (As per Contract): 06-Jul-2023 Actual Date of Completion (Capex): 06-Jan-2026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 34.50/131.60 Noorpur Arab 29.525583 78.492782
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 700//60 Noorpur Arab 29.525583 78.492782
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 200/16 Noorpur Arab 29.525583 78.492782
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI- K7 150 0.020
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 63 4.731
2 HDPE PIPE 75 1.630
3 HDPE PIPE 90 0.299
4 HDPE PIPE 110 0.216
5 HDPE PIPE 125 0.511
6 HDPE PIPE 140 0.072
7 HDPE PIPE 160 0.130
HSC Connection
Sno. Total Nos.
1 470
Other Details
2.38
0.00
2.38
06-Jul-2026
07-Jul-2026