| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20101221 | Name of Scheme: Noorpur Arab WSS | No. of Villages: 2 | No. of Habitation Covered: 2 |
| Total Population Covered: 3336 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2038 |
| Date of Completion (As per Contract): 06-Jul-2023 | Actual Date of Completion (Capex): 06-Jan-2026 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube well | 34.50/131.60 | Noorpur Arab | 29.525583 | 78.492782 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump | 700//60 | Noorpur Arab | 29.525583 | 78.492782 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 200/16 | Noorpur Arab | 29.525583 | 78.492782 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI- K7 | 150 | 0.020 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE | 63 | 4.731 | |
| 2 | HDPE PIPE | 75 | 1.630 | |
| 3 | HDPE PIPE | 90 | 0.299 | |
| 4 | HDPE PIPE | 110 | 0.216 | |
| 5 | HDPE PIPE | 125 | 0.511 | |
| 6 | HDPE PIPE | 140 | 0.072 | |
| 7 | HDPE PIPE | 160 | 0.130 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 470 |