| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20101745 | Name of Scheme: RAMPURWA KHURD MAHASI (VPL) MVS PWS | No. of Villages: 3 | No. of Habitation Covered: 8 |
| Total Population Covered: 2028 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 03-Feb-2025 | Actual Date of Completion (Capex): 31-Dec-2026 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELL-1,2 | 48/456.92 | RAMAWAPUR KHURD | 27.537213 | 81.366567 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT-PUMP | 33.6/45 | RAMAWAPUR KHURD | 27.537213 | 81.366567 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | ZnAl OVER HEAD TANK | 100KL/12M | RAMAWAPUR KHURD | 27.537213 | 81.366567 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 100 | 0.035 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 8.920 | |
| 2 | HDPE | 75 | 0.405 | |
| 3 | HDPE | 90 | 0.057 | |
| 4 | HDPE | 110 | 1.392 | |
| 5 | HDPE | 125 | 0.121 | |
| 6 | HDPE | 140 | 0.450 | |
| 7 | HDPE | 160 | 0.386 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 350 |