Project Completion Certificate (Ground Water)
Scheme ID: 20101793 Name of Scheme: SULTAN NAGAR URF SADAKPUR WSS No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2652 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 06-Jul-2023 Actual Date of Completion (Capex): 15-May-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 26.06 / 162.80 SULTAN NAGAR URF SADAKPUR 29.594337 78.254337
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 560 / 60 SULTAN NAGAR URF SADAKPUR 29.594337 78.254337
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175 KL / 12 MTR SULTAN NAGAR URF SADAKPUR 29.594337 78.254337
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 150 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 1.5789
2 HDPE 75 0.1075
3 HDPE 90 1.580
4 HDPE 110 0.4494
5 HDPE 125 0.2604
6 HDPE 140 0.1536
7 HDPE 160 0
8 HDPE 180 0.035
9 HDPE 200 0
HSC Connection
Sno. Total Nos.
1 571
Other Details
2.33
0.00
2.30
15-Nov-2025
16-Nov-2025