Project Completion Certificate (Ground Water)
Scheme ID: 20102005 Name of Scheme: PUREY CHEETAN WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1123 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 24-Sep-2024 Actual Date of Completion (Capex): 06-Sep-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18.12/134.97 Purey Cheetan 27.5205 82.19844
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump -1 230 LPM Discharge/ 39 mtr Head Purey Cheetan 27.5205 82.19844
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 75 KL/12 Mtr Purey Cheetan 27.5205 82.19844
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI, K-7 100 0.017
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 110 163
2 HDPE 90 110
3 HDPE 75 2140
4 HDPE 63 3651
HSC Connection
Sno. Total Nos.
1 174
Other Details
1.25
0.00
2.34
06-Dec-2025
06-Dec-2025