| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20102048 | Name of Scheme: Semra Manapur | No. of Villages: 2 | No. of Habitation Covered: 13 |
| Total Population Covered: 7790 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 25-Oct-2024 | Actual Date of Completion (Capex): 30-Aug-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Deep Tube well - 650 LPM | 24 M / 115.30 M | Semra Manapur | 25.903989 | 81.083552 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | 17.50 HP Submersible Pump | 650 LPM / 60 M | Semra Manapur | 25.903989 | 81.083552 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | Elevated Storage Reservoir | 250 KL / 18 M | Semra Manapur | 25.903981 | 81.083489 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. K-9 | 125 | 0.009 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 5.4495 | |
| 2 | HDPE | 75 | 3.7249 | |
| 3 | HDPE | 90 | 4.6196 | |
| 4 | HDPE | 110 | 5.998 | |
| 5 | HDPE | 125 | 2.8072 | |
| 6 | HDPE | 140 | 2.2805 | |
| 7 | HDPE | 160 | 3.426 | |
| 8 | HDPE | 180 | 0.5095 | |
| 9 | HDPE | 200 | 1.117 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 1388 |