Project Completion Certificate (Ground Water)
Scheme ID: 20102128 Name of Scheme: Pova No. of Villages: 1 No. of Habitation Covered: 6
Total Population Covered: 2289 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 21-May-2024 Actual Date of Completion (Capex): 19-Aug-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 23/250.34 POVA 26.60532 79.843143
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE 600/64 POVA 26.60532 79.843143
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175/18 POVA 26.60532 79.843143
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI/K7 100 0.114
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.929
2 HDPE 90 2.757
3 HDPE 110 1.019
4 HDPE 125 0.648
5 HDPE 160 1.029
6 HDPE 180 2.147
HSC Connection
Sno. Total Nos.
1 444
Other Details
3.49
0.00
2.86
19-Aug-2024
20-Aug-2024