Project Completion Certificate (Ground Water)
Scheme ID: 20102300 Name of Scheme: FAIJPUR WSS No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1830 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 06-Jul-2023 Actual Date of Completion (Capex): 10-Nov-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube Well 18.05 / 131.36 Faijpur 29.133919 78.445875
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 400 / 52 Faijpur 29.133919 78.445875
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150 / 12 Faijpur 29.133919 78.445875
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI - K7 100 0.040
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 5.550
2 HDPE 75 0.169
3 HDPE 90 0.238
4 HDPE 110 0.027
5 HDPE 140 0.121
HSC Connection
Sno. Total Nos.
1 358
Other Details
1.64
0.00
1.71
10-May-2026
11-May-2026