Project Completion Certificate (Ground Water)
Scheme ID: 20102317 Name of Scheme: SADANPUR WSS No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1955 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 06-Jul-2023 Actual Date of Completion (Capex): 16-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 30.01 / 114.19 SADANPUR 29.18305 78.575857
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 450 / 50 SADANPUR 29.18305 78.575857
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 125 KL / 14 MTR SADANPUR 29.18305 78.575857
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 100 0.024
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.9175
2 HDPE 75 0.2776
3 HDPE 90 0.1526
4 HDPE 110 0.2142
5 HDPE 125 0.2702
6 HDPE 140 0
7 HDPE 160 0.1802
8 HDPE 180 0
9 HDPE 200 0
HSC Connection
Sno. Total Nos.
1 362
Other Details
1.61
0.00
1.67
16-Jun-2025
17-Jun-2025